Permits & code

Basement permits in Utah County, explained.

Every basement finish in our cities needs a permit, and every legal bedroom needs a code egress window. Here's what your city requires — and how we make it invisible to you.

What each city requires

CityBasement finish permitNotes for apartments
LehiRequired — plans + inspectionsInternal apartment application (~$25), dedicated parking stall, owner-occupancy declaration
Eagle MountainRequired — city lists basement finishes explicitlyOne accessory apartment per lot; owner occupies one unit; separate side/rear entrance
Saratoga SpringsRequiredApartment registration + occupancy permit; separate exterior entrance; one paved stall
American ForkRequiredAccessory apartment ordinance currently requires two extra off-street stalls (being updated)
Draper / Herriman / South JordanRequiredCity-specific apartment rules — we confirm for your address
Utah cities are amending accessory-apartment ordinances through late 2026 under new state law. We verify current requirements with your building department before design.
Egress windows: the rule that matters most
Every sleeping room below grade needs an escape opening: 5.7 sq ft net clear, at least 20″ wide and 24″ tall, sill no higher than 44″, with a proper window well and ladder where required. Cutting one into concrete is foundation work — it has to be engineered, waterproofed, and inspected. It's also the single best thing you can do for basement light.
Why unpermitted finishes cost more later
Unpermitted basements surface in every sale — appraisers flag them, buyers renegotiate, insurers question claims, and cities can require walls opened for inspection. The permit costs a fraction of one month of the project. There is no version of skipping it that saves money.

Permit questions, answered

Do I need a permit to finish my basement in Utah?

Yes. Every city we serve requires a building permit for a basement finish — framing, electrical, plumbing, and mechanical are all inspected. Unpermitted work surfaces at resale, complicates insurance claims, and makes a future apartment registration impossible.

What are Utah's egress window requirements?

Every basement sleeping room needs an emergency escape opening: at least 5.7 sq ft of net clear opening, minimum 20″ wide and 24″ high, with the sill no more than 44″ above the floor, plus a code-compliant window well with a ladder if it's deeper than 44″.

How long do permits take?

Residential basement permits in our cities typically issue in one to three weeks once drawings are submitted. We fold that into the schedule — design and bid happen while the permit is in review, so it rarely adds calendar time.

What inspections happen during a basement finish?

Typically four: rough framing/electrical/plumbing (before insulation), insulation, drywall screw, and final. Your city may combine or add steps — we schedule and attend all of them.

Never stand in a permit line.

Drawings, application, and every inspection — handled as part of every Beehive project.